Terminal 3 at Harry Reid International Airport is a three-level, 1.8 million-square-foot facility that transformed passenger processing and strengthened international connectivity in the Las Vegas region.

Client
Clark County Department of Aviation
Construction Delivery
Design-Bid-Build
PGAL Scope
FF&E, Full Architectural Services, Interior Design, Program Design Document, Programming
Completion Date
2012
terminal aerial view

As part of a campus-wide modernization effort, the terminal introduced 14 new aircraft gates, including seven swing gates designed to accommodate wide-body international flights. Infrastructure was also designed to support an adjacent 30-gate concourse connected via an underground Automated Transit System, allowing for flexible gate operations.

The Federal Inspection Services (FIS) area processes up to 1,600 international arrivals per hour, meeting U.S. Customs and Border Protection Model Ports of Entry standards and supporting Global Entry travelers. Additional features include multiple security checkpoints, in-line baggage screening systems, inbound and outbound baggage systems, and a full range of passenger amenities such as dining, retail, and gaming.

The terminal is supported by a new roadway network, structured parking, and a central utility plant that serves all connected facilities.

elevation sketch
sketch

I have been continually impressed by PGAL’s genuine effort to provide the highest caliber of professional services. They have proven to be responsive and attentive to the demands of this $2B program and remain committed to working with the Department of Aviation and its stakeholders to deliver a functional, flexible, and operationally efficient design on time and within budget.