This five-level precast concrete parking garage delivers 730 spaces to support staff and visitor needs at Houston Methodist Willowbrook Hospital. Designed for continuous hospital operations, the project was carefully phased to minimize disruption during construction.

Client
Houston Methodist Hospital
Construction Delivery
Design-Build
PGAL Scope
Full Architectural Services, Programming, Site Design + Utilities
Completion Date
2018
elevators

An elevated pedestrian bridge links the North Pavilion Building to the CUP Building, providing a safe and convenient path across the site. The bridge spans 50 to 80 feet above grade and was constructed below an active utility connector, requiring careful coordination and integration with existing infrastructure.

Both the garage and bridge use materials that match the campus’s architectural language, creating a cohesive connection between new and existing facilities. The garage includes interior build-out and direct tie-ins to adjacent buildings, supporting long-term operational flexibility and improving campus circulation.