A four-level parking garage was constructed to serve both the SFRTA Headquarters and the adjacent Tri-Rail commuter station. The 477-space facility supports daily operations for transit staff and provides convenient access for commuters and the public.

Client
Gulf Building, LLC
Construction Delivery
Design-Build
PGAL Scope
Full Architectural Services
Completion Date
2016
Sustainability Achievement
LEED Gold

Situated on a constrained site that previously functioned as the station’s surface parking lot, the garage was built while maintaining full station operations. This required careful phasing and coordination to minimize disruption to transit services.

The structure incorporates a rooftop photovoltaic system and electric vehicle charging stations, contributing to the project’s LEED Gold certification. Designed to withstand hurricane-force winds up to 175 mph, the garage also includes a manually wet standpipe system and full fire alarm coverage for enhanced safety.