Bush IAH East Sanitary Sewer Collection System for ISEP Program (HAS Project 500K)
Houston, Texas
Construction Cost: $1.9M
Completion Date: 2001
Preliminary engineering and final design for 1,080 GPM submersible pump lift station; 6,140 LF of 12-inch force main installed by open cut and auger construction, 113 LF of 15-inch sanitary sewer installed by wood box tunnel construction, and 1,300 LF of 18-inch sanitary sewer installed by microtunnel. The system serves Terminals C, E and a future terminal as well as the Federal Inspection Services Building.