City of Houston Lift Station Repair and Replacement (WW4728)
Houston, Texas
Construction Cost: $11M
Completion Date: 2006
Preliminary engineering, final design, and construction phase services for improvements and replacement of 14 wastewater lift stations: Alder, Sharpview, Westhollow, High Star, Cook No. 1, Cook No. 2, Sharpcrest, Brookfield, Roark No. 2, Roark No. 3, Roark No. 4, Stroud, Richmond No. 1, and Westpark No. 2 Lift Stations. The proposed lift station capacities range from 500 GPM to 10,000 GPM, the gravity sewer range from 8” to 30”, and force mains range from 4” to 20”. The construction of proposed sewer lines utilizes open-cut, auger, jack and bore, microtunnel, and wood box tunnel construction methods.



