Texas Department of Transportation I-10 Section 3
Houston, Texas
Construction Cost: $158M
Completion Date: 2008
Prepared plans, specifications and estimates for widening a 2.5-mile stretch of I-10 to ten main lanes with auxiliary lanes, three lane frontage roads per direction and four HOV/SUL. The design includes four overpasses, one braided ramp, special use land access structure, and entrance and exit ramps. Work includes oversight of all utility adjustments and relocations. Design provides for the relocation of the City's sanitary sewer and water facilities and a large detention pond for area drainage.