Metropolitan Transit Authority of Harris County Light Rail Line Section 5
Houston, Texas
Construction Cost: $36M
Completion Date: 2003
Prepared civil, structural, architectural and urban design for METRO Light Rail Line Section 5, which travels through Houston’s Central Business District. This fast track design includes paving, sidewalk and streetscape modifications, traffic signals and controls, embedded track slabs, substation and pole foundations, esplanades, station art and architecture, residual utility work and stations and amenities as well as structural modifications to the historic Main Street Bridge.



