Harris County Gellhorn Drive
Houston, Texas
Construction Cost: $11.4M
Completion Date: 2007
Prepared hydraulic analysis, preliminary engineering and final design for this City of Houston/Harris County/TxDOT joint project. The project includes a two-mile section of roadway, twin bridges over Hunting Bayou, a large span culvert, retaining walls, storm sewers, a detention pond, approximately 10,000 LF of 16 inch waterline, traffic signals and traffic control.



