Corpus Christi International Airport Commercial Aviation Apron Improvements
Corpus Christi, Texas
Construction Cost: $7M
Completion Date: 2007
Prepared preliminary engineering and final design for the reconstruction of 50,000 SF of concrete general aviation apron as well as airfield drainage improvements to upsize existing culverts and drainage ways to convey the 25-year design storm.



