George Bush Intercontinental Airport
Hydraulic Study and Design
Houston, Texas
Construction Cost: $2.1M
Completion Date: 2000
Completed a hydraulic study and subsequent design for Ditch D and the North-South tributary to Ditch D. The project includes improvement or relocation of 7,000 feet of drainage in 10-foot width channel with depths up to 10-feet. In addition, prepared analysis and design for a new box culvert in Ditch D.



